G670:2023 Fibre Ready MDUs for Real Estate Development Projects
The Guideline was created to:
- Provide guidance on multi-unit and multi-building developments;
- Clarify the definition of popular Conduit sizes; and
- Maintain consistency with other industry documents.
The Guideline is designed to:
- outline the minimum standard for Telecommunications spaces within a Real Estate Multi Tenanted building Development Project to be considered a Fibre Ready Facility;
- describe recommended processes for the design and installation of Telecommunications facilities for use in the deployment of Optical Fibre Lines in a Real Estate Multi-Tenanted building Development Project; and
- describe the recommended materials used in the design and installation of facilities.